AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (507.2 KB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline

Modification Management for Construction Processes

Wolfgang HuhntSven RichterFelix Enge( )
Institute of Civil Engineering, Berlin Institute of Technology, D-10623 Berlin, Germany
Show Author Information

Abstract

This paper presents an approach to handle different types of subsequent modifications in construction processes. It is focused on a formalized approach with the objective that effects of subsequent modifications are detected automatically. The approach presented in this paper makes use of an existing modeling technique specifically focused on construction processes. The modeling techniques result in a process description where all technological interdependencies between construction activities are considered and where consistency between the sequence of activities and the history of components is guaranteed. This modeling technique is expanded by an existing concept for handling versions and dependencies between objects. The integration of these different concepts makes it possible to track effects of relevant types of subsequent modifications in construction processes on a formalized basis. Effects of subsequent modifications are detected by algorithms, different versions can be compared by algorithms and different versions are stored so that subsequent modifications are documented. The innovation of the approach presented is the completeness. Effects of different relevant types of subsequent modifications in construction processes are tracked on a formalized basis.

References

【1】
【1】
 
 
Tsinghua Science and Technology
Pages 185-191

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Huhnt W, Richter S, Enge F. Modification Management for Construction Processes. Tsinghua Science and Technology, 2008, 13(S1): 185-191. https://doi.org/10.1016/S1007-0214(08)70147-0

0

Views

0

Downloads

0

Crossref

0

Web of Science

0

Scopus

0

CSCD

Received: 28 May 2008
Published: 15 July 2026
© Tsinghua University Press 2008