AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (261 KB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline

Applying AHP-Based CBR to Estimate Pavement Maintenance Cost

Department of Construction Engineering, Taiwan Tech (NTUST), 43 Sec.4, Keelung Rd., Taipei 106
Show Author Information

Abstract

The cost-efficacy control of maintenance operations in developing countries has become critical to the infrastructure asset management after highway construction. To effectively manage numerous projects annually with limited resources, it is necessary to reasonably estimate costs during the process of making maintenance project selection decisions. This study outlines the modeling of case-based reasoning (CBR) estimation that compares and retrieves the most similar instance across the case library. Four CBR approaches were presented and assessed in terms of their mean absolute prediction error rates. The resulting model demonstrates the ability of estimating the pavement maintenance project costs with the satisfactory accuracy at the early stages.

References

【1】
【1】
 
 
Tsinghua Science and Technology
Pages 114-120

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Chou J-S. Applying AHP-Based CBR to Estimate Pavement Maintenance Cost. Tsinghua Science and Technology, 2008, 13(S1): 114-120. https://doi.org/10.1016/S1007-0214(08)70136-6

0

Views

0

Downloads

0

Crossref

0

Web of Science

0

Scopus

0

CSCD

Received: 30 May 2008
Published: 15 July 2026
© Tsinghua University Press 2008