@article{FAN2026, 
author = {Ziyuan FAN and Xueying YU and Huaqiang LI and Yang LIU and Zhenbo WEI and Yi ZHOU},
title = {Planning Strategy for Energy Routers in Distribution Networks Based on Partitioning},
year = {2026},
journal = {Advanced Engineering Sciences},
volume = {58},
number = {6},
pages = {205-216},
keywords = {energy router, distribution network, two-stage planning, distributed generation, complex network theory, configuration strategy},
url = {https://www.sciopen.com/article/10.12454/j.jsuese.202500472},
doi = {10.12454/j.jsuese.202500472},
abstract = {ObjectiveThe energy router (ER) is an intelligent power electronic device that features bidirectional regulation and multiport interconnection, enabling efficient coordination among diverse energy types and voltage levels. However, ER planning involves multiple interdependent factors, including deployment locations, connection topologies, and capacity allocation, resulting in a complex, high-dimensional optimization problem. In this study, we propose a two-stage planning method that integrates network partitioning, source-load centroid identification, and bilevel optimization modeling to determine optimal ER deployment locations and configurations.MethodsThe proposed planning method was organized into two stages to address the complexity of ER deployment and configuration under high distributed generation (DG) penetration. In the first stage, the distribution network was represented as a weighted graph, in which line weights were established based on electrical betweenness. A Louvain-based community detection algorithm was employed to divide the network into subregions. Within each subregion, the power source and load centroids were identified by relaxing the source-load distribution and calculating a synthetic centroid. The resulting centroid nodes were mapped to actual physical nodes, which served as candidate locations for ER deployment. The required number of ERs was determined based on the number of subregions. In the second stage, a bilevel optimization model was formulated. The upper level determined the number of ports and the interconnection scheme for each ER, with the objective of minimizing the total system cost, including ER investment and operating expenses. Based on the upper-level decisions, the lower level optimized the port capacity configuration and dispatch strategy under uncertainties in wind generation, solar generation, and load demand. A two-stage adjustable robust optimization model was employed to ensure operational feasibility across a range of worst-case disturbance scenarios. The column-and-constraint generation algorithm and duality theory were applied to solve the robust model iteratively, ensuring computational tractability and the robustness of the planning solution.Results and Discussions Case studies conducted on a modified IEEE-33 bus system demonstrated the effectiveness of the proposed method. Compared to the baseline case without ER deployment, the proposed method reduced the annual system cost by 27.14% and improved the ER return on investment (ROI) by 81.9% relative to existing single-ER strategies. The proposed ER planning approach also achieved 100% DG utilization and significantly reduced voltage deviations, with the maximum voltage offset decreasing by 48.73% compared to the baseline. The ERs operated at nearly full capacity during peak hours, achieved an average operational efficiency of 96.1%, and maintained full-load operation for extended periods. Sensitivity analyses indicated that the deployment of two ERs provided an optimal balance between cost and ROI and outperformed underdeployment and overdeployment scenarios. Reducing the unit port capacity, for example, to 10 kVA, improved voltage regulation and increased port utilization through greater configuration flexibility. Across different DG penetration levels, ranging from 1.0 to 1.6, the ER layout remained largely unchanged. Higher penetration levels resulted in greater cost reductions and higher ROI, with the maximum ROI recorded under the 1.6 scenario. Although higher port capacities introduced some redundancy during periods of low output, the overall efficiency remained above 92%, which demonstrated robust adaptability to variations in DG output.ConclusionsThe proposed two-stage ER planning method effectively addresses the challenges associated with high DG penetration in radial distribution networks. This method improves economic efficiency, renewable energy accommodation, and voltage stability by integrating network partitioning, gravity center-based deployment, and robust bilevel optimization. Simulation results confirm its adaptability, cost-effectiveness, and scalability under diverse operating conditions, making it a practical solution for next-generation distribution network planning.}
}