@article{Chen2026, 
author = {Guangye Chen and Tongliang Gong and Yangzong Cidan  and Zexi Su and Lei Li and Lin Zeng},
title = {Reconstructing flood escalation and the timing of protective actions in underground transport from public evidence [version 1]},
year = {2026},
journal = {Hydrosphere},
keywords = {Urban flooding, underground transport, protective action, disaster reconstruction, temporal uncertainty, emergency response},
url = {https://www.sciopen.com/article/10.26599/HYD.2026.9380014.V1},
doi = {10.26599/HYD.2026.9380014.V1},
abstract = {Flood-response evaluations compare times that may represent different water states, action roles or completion stages. We examined how these distinctions change the timing judgments supported by public evidence for four floods affecting five underground transport facilities in Zhengzhou, Guangzhou, Singapore and Osong. Official accounts were decomposed into source-linked propositions retaining facility scope, action status, temporal bounds and narrative order. We tested reference substitution, point assignment to uncertain records, recovery endpoints and publication differences. Zhengzhou's tunnel closure occurred approximately 76 min after a reported depth criterion but 74 min before submergence, measuring different stages of escalation. Osong's approximately 120 min from a control criterion to full inundation could not represent a response duration because traffic control was explicitly not implemented. Guangzhou's suspension window extended from 3 min before to 4 min after plan activation, leaving strict order unresolved. Singapore's records distinguished clearance from restored service and contained a 14 min difference between restoration claims. Preserving source meaning changed the quantity measured, identifiable order and precision. The reconstruction identifies which comparisons public flood records support and which additional observations are needed to evaluate completed protection.}
}