TY - JOUR AU - JIANG, Tingwei AU - TANG, Chengpan AU - HU, Xiaogong AU - ZHOU, Shanshi AU - CAO, Yueling PY - 2025 TI - Method for regional real-time satellite clock offset estimation considering group delay variation JO - Journal of Beijing University of Aeronautics and Astronautics SN - 1001-5965 SP - 3833 EP - 3841 VL - 51 IS - 11 AB - Real-time satellite clock estimation based on regional networks is a prerequisite for regional precise point positioning (PPP) services such as the BDS-3 PPP-B2b service. However, issues like low precision and persistent bias plague regional real-time satellite clock estimate, which is constrained by the dispersion of ground stations. Group delay variation (GDV), which varies with satellite elevation angle, is the low-frequency part of the code multipath. The existence of GDV will affect the convergence of the regional network clock estimation and needs to be corrected. Therefore, this contribution extracts and models GDV between 15 regional stations and BDS-3/ global positioning system(GPS) satellites, and applies the GDV model to real-time clock estimation based on regional observation, and analyzes its impact. The results show that, after considering the GDV correction, the root mean square (RMS) of BDS-3 and GPS satellite clock offsets are reduced by 24% and 18%, respectively; the standard deviation (STD) is increased by 56% and 52% for BDS-3 and GPS, respectively. Finally, the clock offset is used in kinematic PPP. The BDS-3-only positioning accuracy is improved by 37% and 19% in the horizontal and vertical directions, respectively, by using the clock offset that accounts for the GDV correction. A similar conclusion can also be found in the GPS-only case, whose positioning accuracy is increased by 49% and 27% in the horizontal and vertical direction, respectively, and in the GPS/BDS-3 case, whose accuracy is increased by 61% and 32%. UR - https://doi.org/10.13700/j.bh.1001-5965.2023.0615 DO - 10.13700/j.bh.1001-5965.2023.0615